Client
Construction and Development Company
Sector
Residential
Project Type
Cleaning of Fire Sprinkler Chamber
Equipment Used
Combination Tanker and Jetter
Onsite Duration
1 day
Location
London
REQUIREMENTA 4.5m deep large fire sprinkler reservoir chamber at the base of a three-storey basement required cleaning of all the residual construction debris, prior to a specialist rendering company attending site to seal the formed concrete chamber. This required a confined space entry, a combination vacuum tanker capable of removing waste 21 metres below ground level and a jetting facility suitable to remove panned clay and soil material. METHODDue to the location and the nature of the site, the cleaning works had to take place on a Saturday, along with traffic management for the tanker to be parked on the roadway. The confined space team removed all large items of debris from the chamber and then jet washed the chamber, removing all waste via the suction hose. Upon completion a video was recorded by Edincare for the main contractor to pass onto their rendering contractor, to detail the exact works for the rendering. RESULTThe main contractor was able to expeditiously coordinate the next phase of the works for the rendering to take place and communicate the exact site conditions to alleviate any time delays to their project and the consequential related costs. |
|